Building

Missaukee County Mobile Home Ordinance 93-2

Enacted on October 12, 1993, by the Missaukee County Board of Commissioners, Ordinance 93-2 requires all mobiles moved into or within Missaukee County must comply with the following in order to obtain a building permit to set the mobile:

v Year Manufactured 1976 or Newer
v Egress Windows in all Bedrooms
v Minimum 720 sq.ft.
v HUD Data Plate (HUD Sticker) MUST BE POSTED IN MOBILE showing (in part):
o 30 lbs. Snow Roof Load (30 PSF)
o Zoned 1 – Wind
o Zoned 2 – Temperature

Information required to obtain a building permit includes the following:
Property tax number of construction site.
Road or street of construction site, including numbered address if known.
Homeowner’s name and current mailing address.
Current copy of contractor’s license for permits obtained by a contractor. Contractor must completely fill out all of Section II, Part C.
Section VI, Applicant Information, must be completed and signed by applicant.
Foundation plan.
Floor plan.
Well and/or Septic Permit, if new system, or approval from health department if using existing system. Issued through local Michigan Health Department.
Land Use Permit for setting of mobile/modular home within the city limits of Lake City or McBain. Issued through city’s zoning administrator.
Soil and Erosion Permit, if applicable. Issued through the Missaukee County Conservation District.
Driveway Permit, if applicable. Issued through the Missaukee County Road Commission.